Schooner-alexanderhamilton.com
Home
Welcome Aboard
Your Captains
Sailing
Stay & Sail Packages
Like to Crew
Her History
Audio History
Renovation work begins
Schooner-alexanderhamilton.com
Home
Welcome Aboard
Your Captains
Sailing
Stay & Sail Packages
Like to Crew
Her History
Audio History
Renovation work begins
More
  • Home
  • Welcome Aboard
  • Your Captains
  • Sailing
  • Stay & Sail Packages
  • Like to Crew
  • Her History
  • Audio History
  • Renovation work begins
  • Home
  • Welcome Aboard
  • Your Captains
  • Sailing
  • Stay & Sail Packages
  • Like to Crew
  • Her History
  • Audio History
  • Renovation work begins

The renovation work Continues

Mast Repair Nevis April 2024

 After an enjoyable morning sail, just as we were getting ready to drop the sails in a  protected anchorage, the forward top mast gave way.


March-November 2022 Decks & Haul and Ribbs

Blocks & mast table March 2023

Schooner Alexander Hamilton

After block failure during a shakedown sail, it was apparent that they all needed to be replaced. Instruction in the operation of machinery from Stephen in Norfolk, England, was required. Big Thanks to Ed Getley for the use of his workshop and Jim for supplying the wood.

Haul-out Slash November 22

Hull repairs, replacement of frames upcycling and interior and deckwork. 

Decks March 2022

The word "repairs" is said alot during this video Ill try harder in the future.

Leaving Christophe Harbour first time in 19 months.

A big thanks to Christophe Harbour for keeping Alexander Hamilton safe over two Hurricane seasons & COVID.

Remove Interior, adjusting lead ballast Nevis 2019


    Masts, Rigging, Dog House Grenada 2019


      Copyright © 2026 Schooner-alexanderhamilton - All Rights Reserved.


      Powered by

      This website uses cookies.

      We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

      Accept